[ Login ]
There is now 1 visitor on RailTV

Pour lire cette page en français, cliquez sur le drapeau français dans le coin supérieur droit.


You use a deprecated version of RailTV. Please go to http://www.railtv.fr

There are now 230 distinct videos having a total of 112 hours of program inside the RailTV galleries.

Video of the moment

Views: 1047 times

The construction of the St. Gothard base tunnel

Duration: 17:22
Format : 16/9 SD
Author: Mallet Jean-Georges
Entry date: 1/13/2015
Recorded in October 2008

This film makes us participate in a group tour of the construction site of St.Gothard base rail tunnel at the point of attack of Sedrun ( Graubünden ) . The twin-tube tunnel is 57 km long. Participants are routed through the "train of mine workers" and a lift to the tubes located 800 meters deep. Working conditions are harsh because of the constant noise , heat and dust .

Recent videos:

No video found !